Fairwater Day Centre, Cardiff

This project involved the refurbishment and alteration of a former day centre into a dedicated dementia patient drop-in centre for the local Cardiff area, commissioned by Cardiff City Council. The form of contract used was JCT Intermediate with CD.

The project was completed on schedule and within budget, with zero incidents or accidents.

Features

  • Demolition and asbestos removal (licensed and unlicensed)
  • Strip out
  • Alterations to existing and design/installation of new building services, including fire and emergency systems
  • Structural alterations
  • Partitions and both suspended and MF ceilings
  • Aluminium glazed screens
  • Ceiling, wall, and floor finishes
  • External ground work and minor civil engineering

Related Case Studies

A complete refurbishment of the spa room at Weston Hospice.
A full refurbishment to transform a vacant bank unit into a beauty clinic.
Accommodation refurbishment at Newbury Railway Station