Fairwater Day Centre, Cardiff

This project involved the refurbishment and alteration of a former day centre into a dedicated dementia patient drop-in centre for the local Cardiff area, commissioned by Cardiff City Council. The form of contract used was JCT Intermediate with CD.

The project was completed on schedule and within budget, with zero incidents or accidents.

Features

  • Plastering of existing walls
  • New picture rails, coving, and panelling throughout 
  • New lights and fittings
  • Painting of walls, woodwork, and windows.
  • Installation of new accessible ramp.
  • Renewal of electrical accessories and install new lighting

Related Case Studies

A complete refurbishment of the spa room at Weston Hospice.
A full refurbishment to transform a vacant bank unit into a beauty clinic.
A shop refit at Clevedon Hill Road